House Building Update - April 8, 2008
This is a blog about Pam, Brian, and Lilly. From time to time we will add videos and pictures that show the things that we do and things that we like.
The roof decking is complete making the framing 99.9% complete. Framing will completed on Wednesday. Plumbing, electrical, HVAC, and roofing will all start very soon (some this week).
They started decking the roof today as well as working to finish the remaining framing. They are now 99.4% finished with framing. The decking should be finished on Tuesday with all of the framing done by the end of the week.
Today, they started installing the windows and finished the coffered ceilings in the study and master bedroom. During Pam's visit this afternoon, she noticed an error in the placement of Lilly's bedroom window. They will have to move the window opening before they can install the windows. The framing is now 98.7% complete with only a few rafters remaining. We are still on schedule for roof decking on Monday.
They are nearing completion on the framing. The rafters are 97.2% done and the roof is scheduled to be decked on Monday (Feb. 11) as long as the wind cooperates. Lately, it has been very windy making it difficult to work on the roof. The windows and doors will be installed on Friday (Feb. 8).
Left Side of House
Rear of House
Right Side of House
Framing still continues. Even with the colder temperatures (20°F in the mornings), they are making good progress. Currently, they are working on the roof rafters. The windows, doors, brick, and stone (Products, Eldorado Stone, Western, Limestone, Monterey) have been ordered and are in. The shingles (Color is Weathered Wood) are on order, but have not yet arrived. We have been working on determining interior features. Go to Pam's blog for interior information. In the pictures below, Lilly's room is the window above and left of the garage door on the left side of the house.